ARC-100 Reactor Probabilistic Safety Analysis Volume 2 – Detailed Modeling and Results
This is an Appendix that will be appended to the main Report body (the main Report is treated separately). This Appendix contains proprietary information and is not intended for public release.
Probabilistic Risk Assessment of a Light Water Reactor Coupled with a High Temperature Electrolysis Hydrogen Production Plant
This report details an expansion of the original two generic probabilistic risk assessments (PRAs) for the addition of a heat extraction system (HES) to a light-water reactor, one for a pressurized-water reactor and one for a boiling-water reactor. The new material in this revision includes a new HES design, direct electrical coupling of the nuclear […]
ARC-100 Transient Overpower Scenario Modeling
This report captures the analysis performed for the transient overpower scenario modeling for the ARC-100 reactor.
Techno-Economic Analysis of Product Diversification Options for Sustainability of the Monticello and Prairie Island Nuclear Power Plants
The objective of this work was to perform techno-economic analysis (TEA) of hybrid options that could be integrated with light water reactor (LWR) nuclear power plants (NPPs) in order to improve the viability and sustainability of existing LWRs through product diversification by utilizing nuclear energy not only to produce grid electricity but to also produce […]
Industry Level Integrated Fire Modeling Using Fire Risk Investigation in 3D (FRI3D)
The software Fire Risk Investigation in 3D (FRI3D) has been developed over the last 2 years to integrate 3D spatial modeling with existing fire probabilistic risk assessment (PRA) models and fire simulation codes. The goal of this research and development is to automate many of the fire analysis manual tasks to reduce industry efforts in […]