​Home > Subcontractors Documents
  
  
  
Composites R_D Techcnical Issues.pdf
  
7/29/2015 9:40 AM
Conceptual Design Work Plan Task Work Plan Outline and Content Conceptual Design Phase FY 09 and 10.pdf
  
7/29/2015 9:42 AM
Contamination Control.pdf
  
7/29/2015 9:40 AM
DDN Update and Configuration Explanatory Notes and DDN List for the PBMR.zip
  
7/29/2015 9:42 AM
Discussion of Changes in the TRL Ratings from the First TRL Repot not due to ROT.pdf
  
7/29/2015 9:40 AM
HTGR Component Test Facility (CTF) Feasibility.pdf
  
7/29/2015 9:42 AM
IHX and Heat Transport System.pdf
  
7/29/2015 9:41 AM
Intermediate Heat Exchanger Development and Trade Studies.pdf
  
7/29/2015 9:41 AM
Licensing Risk Reduction Study.pdf
  
7/29/2015 9:41 AM
Metallic Component Schedule Risk and Cost Uncertainty Assessment.pdf
  
7/29/2015 9:40 AM
Next Generation Nuclear Plant-Emergency Planning Zone Definition at 400 Meters.pdf
  
7/29/2015 9:42 AM
NGNP and Hydrogen Production Preconceptual Design Report.pdf
  
7/29/2015 9:41 AM
NGNP Conceptual Design Study IHX and Heat Transport System.pdf
  
7/29/2015 9:42 AM
NGNP Conceptual Design Study Reactor Parametric Study.pdf
  
7/29/2015 9:40 AM
NGNP CTF Test Loop Preconceptual Design Report - Section 10 - System Integration.pdf
  
7/29/2015 9:40 AM
NGNP CTF Test Loop Preconceptual Design Report.pdf
  
7/29/2015 9:41 AM
NGNP Hydrogen Plant Alternatives Study.pdf
  
7/29/2015 9:42 AM
NGNP Technology Development Road Mapping - Integrated Schedule and Cost Estimate.pdf
  
7/29/2015 9:40 AM
NGNP Technology Development Road Mapping Report.pdf
  
7/29/2015 9:42 AM
NGNP Technology Development Roadmapping Report - Steam Production at 750C-800C.pdf
  
7/29/2015 9:42 AM
ngnp-nhs 100-rxbldg.pdf
  
7/29/2015 9:42 AM
NGNP-PLD-GEN-RPT-N-00007_Rev0.pdf
  
7/29/2015 9:40 AM
Report on Technology Readiness Levels and Design Readiness Levels for NGNP Steam Production at 750-800C.pdf
  
7/29/2015 9:41 AM
Special Study 20.1 - Reactor Type Comparison.pdf
  
7/29/2015 9:41 AM
Special Study 20.2 - Prototype Power Level.pdf
  
7/29/2015 9:40 AM
Special Study 20.3 - High Temperature Process Heat Transfer and Transport.pdf
  
7/29/2015 9:40 AM
Special Study 20.4 - Power Conversion System.pdf
  
7/29/2015 9:40 AM
Special Study 20.6 - NGNP Licensing and Permitting Study.pdf
  
7/29/2015 9:40 AM
special study 20-6 NGNP By-Products and Effluents Study.pdf
  
7/29/2015 9:42 AM
Technical and Functional Requirements, Heat Transport Small Scale Testing Loop.pdf
  
7/29/2015 9:42 AM
1 - 30Next