​Home > Subcontractors Documents
  
  
  
12-9052076-001.pdf
  
7/29/2015 9:29 AM
12-9076325-001.pdf
  
7/29/2015 9:29 AM
12-9088427-001.pdf
  
7/29/2015 9:29 AM
AREVA DDN.pdf
  
7/29/2015 9:28 AM
Hith Temperature Gas Reactor Component Test Facility Mission Needs and Requirements.pdf
  
7/29/2015 9:29 AM
Infrastructure Readiness Assessment for the NGNP.pdf
  
7/29/2015 9:28 AM
Key Pebble Bed Reactor Design Requirements.pdf
  
7/29/2015 9:29 AM
NGNP - Design Data Needs for AREVA 750 Degree Celcuis Prismatic Reactor Concept.pdf
  
7/29/2015 9:28 AM
NGNP Component Test Facility Conceptual Configuration, Cost, and Schedule Estimate.pdf
  
7/29/2015 9:29 AM
NGNP Component Test Facility Cost and Schedule Report.pdf
  
7/29/2015 9:29 AM
NGNP Component Test Facility Test Loop Pre-Conceptual Design Executive Summary.pdf
  
7/29/2015 9:29 AM
NGNP Component Test Facility Test Loop Pre-Conceptual Design.pdf
  
7/29/2015 9:29 AM
NGNP Conceptual Design - Point Design.pdf
  
7/29/2015 9:28 AM
NGNP Conceptual Design Baseline Document for Conventional Steam Cycle for Process Heat and Cogeneration.pdf
  
7/29/2015 9:29 AM
NGNP Conceptual Design Power Level and Number of Loops Trade Study Plan.pdf
  
7/29/2015 9:29 AM
NGNP Conceptual Design Studies Baseline Document for Indirect Steam Cycle Configuration Revision 1.pdf
  
7/29/2015 9:29 AM
NGNP Conceptual Design Studies Baseline Document for Indirect Steam Cycle Configuration.pdf
  
7/29/2015 9:29 AM
NGNP Conceptual Design Studies Work Plan.pdf
  
7/29/2015 9:29 AM
NGNP Fuel Design Special Study.pdf
  
7/29/2015 9:29 AM
NGNP Heat Transport Small Scale Testing - Loop Technical and Functional Requirements.pdf
  
7/29/2015 9:28 AM
NGNP Heat Transport Small Scale Testing - Review and Assessment of TDRM Identified Tests.pdf
  
7/29/2015 9:29 AM
NGNP Nuclear Heat Source System Boundaries and Interfaces.pdf
  
7/29/2015 9:29 AM
NGNP Plant Design Requirements Document Rev 1.pdf
  
7/29/2015 9:29 AM
NGNP Reactor Parametric Study.pdf
  
7/29/2015 9:29 AM
NGNP Risk Evaluation of Major Components.pdf
  
7/29/2015 9:29 AM
NGNP TDRM Schedule and Cost Estimate.pdf
  
7/29/2015 9:29 AM
NGNP Technology Development Road Mapping Report.pdf
  
7/29/2015 9:29 AM
NGNP Technology Readiness Levels for 750C Conventional Steam Cycle Configuration.pdf
  
7/29/2015 9:29 AM
NGNP with Hydrogen Production RPV and IHX Pressure Vessel Alternatives.pdf
  
7/29/2015 9:28 AM
Plant Design Duty Cycle.pdf
  
7/29/2015 9:29 AM
1 - 30Next