This study explores the increasing interest in leveraging nuclear power to meet the escalating energy demands of data centers in the United States (U.S.) by focusing on key factors that contribute to accelerated deployment. The study highlights the importance of N+1/N+2 power supplies (where N is the required number of units), outlines research and innovations in nuclear-integrated data center thermal management and demonstration plan. It also provides updates about status and costing of various reactor system designs. A summarized strengths, weaknesses, opportunities, and threats (SWOT) analysis shows the potential options for grid connectivity, reactors, and site selection. Suitable site discussions consider land and water availability, grid access, and optical fiber connectivity, and the study presents graded prospects for Department of Energy (DOE) sites with a specific example. Community engagement and partnerships are emphasized, particularly the roles of local government, federal agencies, utilities, and data center industry partners, which are crucial for accelerating deployment, business outreach, and approvals. The study provides actionable insights for stakeholders to accelerate the deployment of nuclear-powered data centers.