The thrust of advanced nuclear reactor demonstrations demands the accelerated qualification of in-core materials to enable licensing processes and developing the performance data. Due to the high-operating temperatures of such reactors, long-term mechanical behavior under constant load is essential to determine the geometrical and mechanical integrity of in-core components during operation and off-normal conditions. Therefore, the thermal creep behavior of neutron-irradiated advanced reactor materials must be determined. The feasibility of using subsize specimens for the irradiation campaigns and the limited available infrastructure challenge the assessment of thermal creep behavior of advanced reactor materials. Therefore, the U.S. Department of Energy Office of Nuclear Energy (DOE-NE) National Reactor Innovation Center (NRIC) prioritizes the development of a thermal creep testing infrastructure for multiple subsize specimens to accelerate the demonstration and deployment of advanced reactor concepts. This report describes the activities for the construction of a thermal creep testing capability at Idaho National Laboratory (INL). The overall project consists of conceptual design, out-of-cell demonstration, and in-cell demonstration phases. During fiscal year (FY)-2021, the team finished the conceptual design of a thermal creep test facility that can test multiple subsize specimens. This conceptual design consisted of the determination of technical and functional requirements, the determination of the design space, and the preparation of the technical drawings. Technical and functional requirements were categorized as required and desired capabilities and the conceptual design was performed to meet all the required capabilities with the flexibility to achieve the desired capabilities. The design space identified the operational capacity of the creep frame for different advanced reactor relevant materials with the consideration of the feasible operation in the hotcell at the Fuels and Applied Science Building (FASB) at INL. Based on the requirements and design space, the multiple specimen creep frame was designed. The official INL engineering drawing process was started and the procurement of materials for construction was initiated. For FY-2022, the out-of-cell demonstration and final installation of the multiple creep frame is planned.