Recent advancements in machine learning (ML) and artificial intelligence (AI) technologies provide an opportunity for leveraging data-driven algorithms to predict future nuclear power plant (NPP) operating conditions by using recorded plant process data. Successfully implementing these models can lead to cost-reducing, conditioned-based predictive maintenance through optimized maintenance schedules and a reduction of unnecessary maintenance activities. This report discusses the verification and validation of short-term forecasting processes (i.e., data cleaning, feature selection, model optimization, and forecasting) developed in previous reports. The verification and validation (V&V) process demonstrates the expected precision and accuracy when the ML model encounters new datasets from different systems. Shapley additive explanations were used as the primary means of feature selection across these different data set. Individual models were trained for each data set, then validated through a cross-validation procedure. In this report, two different ML models were tasked to predict variables from three different plant process data sets with varying prediction horizons. The results indicate that support vector regression (SVR) outperformed long short-term memory (LSTM) neural networks in regard to each data set and each prediction horizon in this study, but further tuning and optimization could improve long short-term memory results. However, each forecasting model showed reduced performance as the prediction horizon was extended from 1 hour to 1 day ahead. Research is ongoing to evaluate the optimal input variable space, which is based on a given set of process parameters, to further improve forecasting accuracy.